UPSC Foundation 2026 and JPSC Mentorship admissions open Daily Current Affairs
learnpro Civil Services
LearnPro Menu
Home Current Affairs All Articles
UPSC
UPSC NOTES
STATE PSC
OPTIONAL SUBJECTS
CURRENT AFFAIRS
DAILY EDITORIAL
COURSES
DOWNLOAD NOTES
PYQ Papers Mains Answer Writing Online Courses

CA Topic

India Launches NISAR Earth Observation Satellite

Brief Context

Context The NASA-ISRO Synthetic Aperture Radar (NISAR) satellite was launched from the Satish Dhawan Space Centre at Sriharikota in Andhra Pradesh. NISAR Satellite NISAR is an Earth-observation satellite that stands for NASA-ISRO Synthetic Aperture Radar. It is Jointly developed by the National Aeronautics and Space Administration (NASA) and the Indian Space Research Organisation under a partnership agreement signed in 2014.

Source Content

Syllabus: GS3/ Science and Technology

Context

  • The NASA-ISRO Synthetic Aperture Radar (NISAR) satellite was launched from the Satish Dhawan Space Centre at Sriharikota in Andhra Pradesh.

NISAR Satellite

India-Launches-NISAR-Earth-Observation-Satellite
  • NISAR is an Earth-observation satellite that stands for NASA-ISRO Synthetic Aperture Radar.
  • It is Jointly developed by the National Aeronautics and Space Administration (NASA) and the Indian Space Research Organisation under a partnership agreement signed in 2014.
  • It will be launched into a polar Sun-synchronous dawn-dusk orbit at 747 km altitude and an inclination of 98.4º.
  • NISAR is the first satellite mission to collect radar data in two microwave bandwidth regions, called the L-band and the S-band.
    • The S-band payload has been made by the ISRO and the L-band payload by the U.S. 

Monitoring of Earth Surface

  • The NISAR system comprises a dual frequency, fully polarimetric radar, with an imaging swath greater than 150 miles (240 km). 
  • This design permits complete global coverage every 12-days, allowing researchers to create time-series interferometric imagery and systematically map the changing surface of Earth.
    • It can monitor various aspects in very high resolution.
  • After a 90-day commissioning period, the mission will conduct a minimum of three full years of science operations with the L-band radar to satisfy NASA’s requirements,
    • ISRO requires five years of operations with the S-band radar.

Source: TH